Shared Top Border
Hawaii

02/08/05

 

FY-2006 Aiea WHIP Practice Component Cost List

 Practice
Code
Cost_Share
Program
Practice_Name Component Unit
Type
Unit
Cost
Cost
Type
Share
Rate
314 WHIP BRUSH MANAGEMENT Earthwork, Haul Fee no. 500 AM 75
314 WHIP BRUSH MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
314 WHIP BRUSH MANAGEMENT Brush Management (low intensity) ac. 300 AC 75
314 WHIP BRUSH MANAGEMENT Brush Management (moderate intensity) ac. 600 AC 75
314 WHIP BRUSH MANAGEMENT Brush Management (high intensity) ac. 900 AC 75
317 WHIP COMPOSTING FACILITY Composting Facility no. 0 AM 75
324 WHIP DEEP TILLAGE Deep Tillage ac. 100 AM 75
324 WHIP DEEP TILLAGE Earthwork, Haul Fee no. 500 AM 75
327 WHIP CONSERVATION COVER Earthwork, Haul Fee no. 500 AM 75
327 WHIP CONSERVATION COVER Conservation Cover, Native Plants ac. 1400 AM 75
328 WHIP CONSERVATION CROP ROTATION Earthwork, Haul Fee no. 500 AM 75
328 WHIP CONSERVATION CROP ROTATION Conservation Crop Rotation, Native Plants ac. 1400 AM 75
340 WHIP COVER CROP Earthwork, Haul Fee no. 500 AM 75
340 WHIP COVER CROP Cover Crop ac. 1400 AM 75
342 WHIP CRITICAL AREA PLANTING Earthwork, Haul Fee no. 500 AM 75
342 WHIP CRITICAL AREA PLANTING Critical Area Planting, Native Plants ac. 1400 AM 75
344 WHIP RESIDUE MANAGEMENT, SEASONAL Residue Management, Seasonal ac. 100 AM 75
344 WHIP RESIDUE MANAGEMENT, SEASONAL Management (Non Cost-shared) ac. 0 NC 0
350 WHIP SEDIMENT BASIN Sediment Basin no. 0 AM 75
350 WHIP SEDIMENT BASIN Earthwork, haul fee no. 500 AM 75
362 WHIP DIVERSION Diversion ft. 8 AM 75
362 WHIP DIVERSION Earthwork, Haul Fee no. 500 AM 75
378 WHIP POND Pond no. 0 AM 75
378 WHIP POND Earthwork, haul fee no. 500 AM 75
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Earthwork, Haul Fee no. 500 AM 75
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Windbreak/Shelterbelt Establishment, Native Plants, Single Row ft. 2.35 AM 75
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Windbreak/Shelterbelt Establishment, Native Plants, Double Row ft. 4.70 AM 75
382 WHIP FENCE Fence, Electric (rock) ft. 5.00 AC 75
382 WHIP FENCE Fence, Electric (soil) ft. 2.00 AC 75
382 WHIP FENCE Fence, Game-Proof ft. 12.00 AM 75
382 WHIP FENCE Fence, Non-electric (barbed - rock) ft. 5.50 AC 75
382 WHIP FENCE Fence, Non-electric (barbed - soil) ft. 2.50 AC 75
382 WHIP FENCE Fence, Non-electric (woven wire - rock) ft. 7.00 AC 75
382 WHIP FENCE Fence, Non-electric (woven wire - soil) ft. 4.00 AC 75
382 WHIP FENCE Fence, Power Source, Solar no. 1600 AM 75
388 WHIP IRRIGATION FIELD DITCH Irrigation Field Ditch ft. 8 AM 75
388 WHIP IRRIGATION FIELD DITCH Earthwork, Haul Fee no. 500 AM 75
391 WHIP RIPARIAN FOREST BUFFER Riparian Forest Buffer ac. 3000 AM 75
391 WHIP RIPARIAN FOREST BUFFER Earthwork, haul fee no. 500 AM 75
393 WHIP FILTER STRIP Earthwork, Haul Fee no. 500 AM 75
393 WHIP FILTER STRIP Filter Strip ac. 1400 AM 75
394 WHIP FIREBREAK Earthwork, Haul Fee no. 500 AM 75
394 WHIP FIREBREAK Firebreak ft. 8.00 AM 75
410 WHIP GRADE STABILIZATION STRUCTURE Earthwork, Haul Fee no. 500 AM 75
410 WHIP GRADE STABILIZATION STRUCTURE Grade Stabilization Structure no. 0 AM 75
412 WHIP GRASSED WATERWAY Earthwork, Haul Fee no. 500 AM 75
412 WHIP GRASSED WATERWAY Grassed Waterway ac. 17500 AM 75
422 WHIP HEDGEROW PLANTING Hedgerow Planting, Native Plants ft. 4.70 AM 75
423 WHIP HILLSIDE DITCH Hillside Ditch ft. 4 AM 75
423 WHIP HILLSIDE DITCH Earthwork, Haul Fee no. 500 AM 75
430DD WHIP IRRIGATION WATER CONVEYANCE, PIPELINE, HIGH-PRESSURE, UNDERGROUND, PLASTIC Irrigation Water Conveyance, Pipeline, High-Pressure, Underground, Plastic ft. 6 AM 75
430FF WHIP IRRIGATION WATER CONVEYANCE, PIPELINE, STEEL Irrigation Water Conveyance, Pipeline, Steel ft. 6 AM 75
436 WHIP IRRIGATION STORAGE RESERVOIR Irrigation Storage Reservoir ac-ft 0 AM 75
436 WHIP IRRIGATION STORAGE RESERVOIR Earthwork, Haul Fee no. 500 AM 75
441 WHIP IRRIGATION SYSTEM, MICROIRRIGATION Irrigation System, Microirrigation ac. 0 AM 75
442 WHIP IRRIGATION SYSTEM, SPRINKLER Irrigation System, Sprinkler ac. 0 AM 75
449 WHIP IRRIGATION WATER MANAGEMENT Management ac. 100 AM 75
449 WHIP IRRIGATION WATER MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
468 WHIP LINED WATERWAY OR OUTLET Earthwork, Haul Fee no. 500 AM 75
468 WHIP LINED WATERWAY OR OUTLET Lined Waterway or Outlet ft. 20 AM 75
472 WHIP USE EXCLUSION Use Exclusion, Non-Fence ac. 0 AM 75
484 WHIP MULCHING Mulching ac. 0 AM 75
490 WHIP FOREST SITE PREPARATION Earthwork, Haul Fee no. 500 AM 75
490 WHIP FOREST SITE PREPARATION Forest Site Preparation ac. 0 AM 75
516 WHIP PIPELINE Pipeline (less than 2 Inches In diameter) ft. 1 AC 75
516 WHIP PIPELINE Pipeline (2 inches or more in diameter) ft. 6 AM 75
521A WHIP POND SEALING OR LINING, FLEXIBLE MEMBRANE Pond Sealing or Lining, Flexible Membrane no. 0 AM 75
528 WHIP PRESCRIBED GRAZING Management ac. 100 AM 75
528 WHIP PRESCRIBED GRAZING Management (Non Cost-shared) ac. 0 NC 0
550 WHIP RANGE PLANTING Earthwork, Haul Fee no. 500 AM 75
550 WHIP RANGE PLANTING Range Planting ac. 1400 AM 75
558 WHIP ROOF RUNOFF STRUCTURE Roof Runoff Structure no. 0 AM 75
560 WHIP ACCESS ROAD Access Road ft. 20 AM 75
560 WHIP ACCESS ROAD Earthwork, haul fee no. 500 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Recreation Trail and Walkway ft. 8 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Earthwork, Haul Fee no. 500 AM 75
580 WHIP STREAMBANK AND SHORELINE PROTECTION Streambank And Shoreline Protection ft. 0 AM 75
580 WHIP STREAMBANK AND SHORELINE PROTECTION Earthwork, Haul Fee no. 500 AM 75
582 WHIP OPEN CHANNEL Earthwork, haul fee no. 500 AM 75
582 WHIP OPEN CHANNEL Open Channel ft. 8 AM 75
587 WHIP STRUCTURE FOR WATER CONTROL Structure For Water Control no. 0 AM 75
587 WHIP STRUCTURE FOR WATER CONTROL Earthwork, haul fee no. 500 AM 75
590 WHIP NUTRIENT MANAGEMENT Nutrient Management ac. 100 AM 75
590 WHIP NUTRIENT MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
595 WHIP PEST MANAGEMENT Earthwork, haul fee no. 500 AM 75
595 WHIP PEST MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
595 WHIP PEST MANAGEMENT Management ac. 0 AM 75
595 WHIP PEST MANAGEMENT Management ac. 1500 AM 75
600 WHIP TERRACE Terrace ft. 8 AM 75
600 WHIP TERRACE Earthwork, haul fee no. 500 AM 75
601 WHIP VEGETATIVE BARRIER Earthwork, Haul Fee no. 500 AM 75
601 WHIP VEGETATIVE BARRIER Vegetative Barrier ft. 4.00 AM 75
612 WHIP TREE/SHRUB ESTABLISHMENT Earthwork, Haul Fee no. 500 AM 75
612 WHIP TREE/SHRUB ESTABLISHMENT Vegetative Cover, Native Plants ac. 5000 AM 75
614 WHIP WATERING FACILITY Watering Facility, Tank no. 0 AM 75
614 WHIP WATERING FACILITY Watering Facility, Trough no. 0 AM 75
636 WHIP WATER HARVESTING CATCHMENT Water Harvesting Catchment no. 0 AM 75
638 WHIP WATER AND SEDIMENT CONTROL BASIN Earthwork, Haul Fee no. 500 AM 75
638 WHIP WATER AND SEDIMENT CONTROL BASIN Water and Sediment Control Basin no. 0 AM 75
643 WHIP RESTORATION AND MANAGEMENT OF DECLINING HABITATS Restoration and Management of Declining Species ac. 0 AM 75
643 WHIP RESTORATION AND MANAGEMENT OF DECLINING HABITATS Management (Non Cost-shared) ac. 0 NC 0
644 WHIP WETLAND WILDLIFE HABITAT MANAGEMENT Management ac. 100 AM 75
644 WHIP WETLAND WILDLIFE HABITAT MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
645 WHIP UPLAND WILDLIFE HABITAT MANAGEMENT Management ac. 0 AM 75
645 WHIP UPLAND WILDLIFE HABITAT MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Shallow Water Management For Wildlife ac.. 6400 AC 75
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Management (Non Cost-shared) ac. 0 NC 0
657 WHIP WETLAND RESTORATION Earthwork, Haul Fee no. 500 AM 75
657 WHIP WETLAND RESTORATION Wetland Restoration ac. 0 AM 75
658 WHIP WETLAND CREATION Wetland Creation ac. 0 AM 75
658 WHIP WETLAND CREATION Earthwork, Haul Fee no. 500 AM 75
659 WHIP WETLAND ENHANCEMENT Wetland Enhancement ac. 0 AM 75
659 WHIP WETLAND ENHANCEMENT Earthwork, Haul Fee no. 500 AM 75
666 WHIP FOREST STAND IMPROVEMENT Forest Stand Improvement ac. 500 AM 75
910 WHIP TA PLANNING TA Planning no. 0 FR 100
911 WHIP TA DESIGN TA Design no. 0 FR 100
912 WHIP TA APPLICATION TA Application no. 0 FR 100
913 WHIP TA CHECK-OUT TA Reimbursement for Construction Check-out no. 0 FR 100