Practice
Code |
Cost_Share
Program |
Practice_Name |
Component |
Unit
Type |
Unit
Cost |
Cost
Type |
Share
Rate |
| 314 |
WHIP |
BRUSH MANAGEMENT |
Earthwork, Haul Fee |
no |
500 |
AM |
75 |
| 314 |
WHIP |
BRUSH MANAGEMENT |
Management (Non Cost-shared) |
ac |
0 |
NC |
0 |
|
314 |
WHIP |
BRUSH MANAGEMENT |
Brush Management (Dense, Woody) |
ac |
0 |
AM |
75 |
|
317 |
WHIP |
COMPOSTING FACILITY |
Composting Facility |
no |
0 |
AM |
75 |
|
324 |
WHIP |
DEEP TILLAGE |
Deep Tillage |
ac |
100 |
AM |
75 |
|
324 |
WHIP |
DEEP TILLAGE |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
327 |
WHIP |
CONSERVATION COVER |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
327 |
WHIP |
CONSERVATION COVER |
Conservation Cover, Native Plants |
ac |
1400 |
AM |
75 |
|
328 |
WHIP |
CONSERVATION CROP ROTATION |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
328 |
WHIP |
CONSERVATION CROP ROTATION |
Conservation Crop Rotation, Native Plants |
ac |
1400 |
AM |
75 |
|
340 |
WHIP |
COVER CROP |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
340 |
WHIP |
COVER CROP |
Cover Crop |
ac |
1400 |
AM |
75 |
|
342 |
WHIP |
CRITICAL AREA PLANTING |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
342 |
WHIP |
CRITICAL AREA PLANTING |
Critical Area Planting, Native Plants |
ac |
1400 |
AM |
75 |
|
344 |
WHIP |
RESIDUE MANAGEMENT, SEASONAL |
Residue Management, Seasonal |
ac |
100 |
AM |
75 |
|
344 |
WHIP |
RESIDUE MANAGEMENT, SEASONAL |
Management (Non Cost-shared) |
ac |
0 |
NC |
0 |
|
350 |
WHIP |
SEDIMENT BASIN |
Sediment Basin |
no |
0 |
AM |
75 |
|
350 |
WHIP |
SEDIMENT BASIN |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
362 |
WHIP |
DIVERSION |
Diversion |
ft |
8 |
AM |
75 |
|
362 |
WHIP |
DIVERSION |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
378 |
WHIP |
POND |
Pond |
no |
0 |
AM |
75 |
|
378 |
WHIP |
POND |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
380 |
WHIP |
WINDBREAK/SHELTERBELT ESTABLISHMENT |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
380 |
WHIP |
WINDBREAK/SHELTERBELT ESTABLISHMENT |
Windbreak/Shelterbelt Establishment, Native Plants, Single Row |
ft |
2.35 |
AM |
75 |
|
380 |
WHIP |
WINDBREAK/SHELTERBELT ESTABLISHMENT |
Windbreak/Shelterbelt Establishment, Native Plants, Double Row |
ft |
4.70 |
AM |
75 |
|
382 |
WHIP |
FENCE |
Fence (Non-electric, Barbed Wire - Rock) |
ft |
10.50 |
AM |
75 |
|
382 |
WHIP |
FENCE |
Fence (Non-electric, Barbed Wire - Soil) |
ft |
7.50 |
AM |
75 |
|
382 |
WHIP |
FENCE |
Fence (Non-electric, Woven Wire - Rock) |
ft |
11.00 |
AM |
75 |
|
382 |
WHIP |
FENCE |
Fence (Non-electric, Woven Wire - Soil) |
ft |
9.00 |
AM |
75 |
|
382 |
WHIP |
FENCE |
Fence, Electric (Rock) |
ft |
6.90 |
AM |
75 |
|
382 |
WHIP |
FENCE |
Fence, Electric (Soil) |
ft |
5.50 |
AM |
75 |
|
382 |
WHIP |
FENCE |
Fence, Game-Proof |
ft |
12.00 |
AM |
75 |
|
382 |
WHIP |
FENCE |
Fence, Power Source, Solar |
no |
1600 |
AM |
75 |
|
388 |
WHIP |
IRRIGATION FIELD DITCH |
Irrigation Field Ditch |
ft |
8 |
AM |
75 |
|
388 |
WHIP |
IRRIGATION FIELD DITCH |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
391 |
WHIP |
RIPARIAN FOREST BUFFER |
Riparian Forest Buffer |
ac |
3000 |
AM |
75 |
|
391 |
WHIP |
RIPARIAN FOREST BUFFER |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
393 |
WHIP |
FILTER STRIP |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
393 |
WHIP |
FILTER STRIP |
Filter Strip |
ac |
1400 |
AM |
75 |
|
394 |
WHIP |
FIREBREAK |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
394 |
WHIP |
FIREBREAK |
Firebreak |
ft |
8.00 |
AM |
75 |
|
410 |
WHIP |
GRADE STABILIZATION STRUCTURE |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
410 |
WHIP |
GRADE STABILIZATION STRUCTURE |
Grade Stabilization Structure |
no |
0 |
AM |
75 |
|
412 |
WHIP |
GRASSED WATERWAY |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
412 |
WHIP |
GRASSED WATERWAY |
Grassed Waterway |
ac |
17500 |
AM |
75 |
|
422 |
WHIP |
HEDGEROW PLANTING |
Hedgerow Planting, Native Plants |
no |
20.00 |
AM |
75 |
|
423 |
WHIP |
HILLSIDE DITCH |
Hillside Ditch |
ft |
4 |
AM |
75 |
|
423 |
WHIP |
HILLSIDE DITCH |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
430DD |
WHIP |
IRRIGATION WATER CONVEYANCE, PIPELINE, HIGH-PRESSURE, UNDERGROUND,
PLASTIC |
Irrigation Water Conveyance, Pipeline, High-Pressure, Underground,
Plastic |
ft |
6 |
AM |
75 |
|
430FF |
WHIP |
IRRIGATION WATER CONVEYANCE, PIPELINE, STEEL |
Irrigation Water Conveyance, Pipeline, Steel |
ft |
6 |
AM |
75 |
|
436 |
WHIP |
IRRIGATION STORAGE RESERVOIR |
Irrigation Storage Reservoir |
no |
0 |
AM |
75 |
|
436 |
WHIP |
IRRIGATION STORAGE RESERVOIR |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
441 |
WHIP |
IRRIGATION SYSTEM, MICROIRRIGATION |
Irrigation System, Microirrigation |
no |
0 |
AM |
75 |
|
442 |
WHIP |
IRRIGATION SYSTEM, SPRINKLER |
Irrigation System, Sprinkler |
no |
0 |
AM |
75 |
|
449 |
WHIP |
IRRIGATION WATER MANAGEMENT |
Management |
ac |
100 |
AM |
75 |
|
449 |
WHIP |
IRRIGATION WATER MANAGEMENT |
Management (Non Cost-shared |
ac |
0 |
NC |
0 |
|
468 |
WHIP |
LINED WATERWAY OR OUTLET |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
468 |
WHIP |
LINED WATERWAY OR OUTLET |
Lined Waterway or Outlet |
ft |
0 |
AM |
75 |
|
472 |
WHIP |
USE EXCLUSION |
Use Exclusion, Non-Fence |
ac |
0 |
AM |
75 |
|
484 |
WHIP |
MULCHING |
Mulching |
ac |
0 |
AM |
75 |
|
490 |
WHIP |
FOREST SITE PREPARATION |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
490 |
WHIP |
FOREST SITE PREPARATION |
Forest Site Preparation |
ac |
0 |
AM |
75 |
|
516 |
WHIP |
PIPELINE |
Pipeline (2 Inches In Diameter Or Less) |
ft |
4 |
AM |
75 |
|
516 |
WHIP |
PIPELINE |
Pipeline (More Than 2 Inches In Diameter) |
ft |
6 |
AM |
75 |
|
521A |
WHIP |
POND SEALING OR LINING, FLEXIBLE MEMBRANE |
Pond Sealing or Lining, Flexible Membrane |
no |
0 |
AM |
75 |
|
528A |
WHIP |
PRESCRIBED GRAZING |
Management |
ac |
100 |
AM |
75 |
|
528A |
WHIP |
PRESCRIBED GRAZING |
Management (Non Cost-shared |
ac |
0 |
NC |
0 |
|
550 |
WHIP |
RANGE PLANTING |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
550 |
WHIP |
RANGE PLANTING |
Range Planting |
ac |
1400 |
AM |
75 |
|
558 |
WHIP |
ROOF RUNOFF STRUCTURE |
Roof Runoff Structure |
no |
0 |
AM |
75 |
|
560 |
WHIP |
ACCESS ROAD |
Access Road |
ft |
20 |
AM |
75 |
|
560 |
WHIP |
ACCESS ROAD |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
568 |
WHIP |
RECREATION TRAIL AND WALKWAY |
Recreational Trail and Walkway |
ft |
8 |
AM |
75 |
|
568 |
WHIP |
RECREATION TRAIL AND WALKWAY |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
580 |
WHIP |
STREAMBANK AND SHORELINE PROTECTION |
Streambank And Shoreline Protection |
ft |
0 |
AM |
75 |
|
580 |
WHIP |
STREAMBANK AND SHORELINE PROTECTION |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
582 |
WHIP |
OPEN CHANNEL |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
582 |
WHIP |
OPEN CHANNEL |
Open Channel |
ft |
8 |
AM |
75 |
|
587 |
WHIP |
STRUCTURE FOR WATER CONTROL |
Structure For Water Control |
no |
0 |
AM |
75 |
|
587 |
WHIP |
STRUCTURE FOR WATER CONTROL |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
590 |
WHIP |
NUTRIENT MANAGEMENT |
Nutrient Management |
ac |
100 |
AM |
75 |
|
590 |
WHIP |
NUTRIENT MANAGEMENT |
Management (Non Cost-shared) |
ac |
0 |
NC |
0 |
|
595 |
WHIP |
PEST MANAGEMENT |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
595 |
WHIP |
PEST MANAGEMENT |
Management (Non Cost-shared) |
ac |
0 |
NC |
0 |
|
595 |
WHIP |
PEST MANAGEMENT |
Management |
ac |
0 |
AM |
75 |
|
600 |
WHIP |
TERRACE |
Terrace |
ft |
8 |
AM |
75 |
|
600 |
WHIP |
TERRACE |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
601 |
WHIP |
VEGETATIVE BARRIER |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
601 |
WHIP |
VEGETATIVE BARRIER |
Vegetative Barrier |
ft |
4.00 |
AM |
75 |
|
612 |
WHIP |
TREE/SHRUB ESTABLISHMENT |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
612 |
WHIP |
TREE/SHRUB ESTABLISHMENT |
Vegetative Cover, Native Plants |
ac |
5000 |
AM |
75 |
|
614 |
WHIP |
WATERING FACILITY |
Watering Facility, Tank |
no |
0 |
AM |
75 |
|
614 |
WHIP |
WATERING FACILITY |
Watering Facility, Trough |
no |
0 |
AM |
75 |
|
636 |
WHIP |
WATER HARVESTING CATCHMENT |
Water Harvesting Catchment |
no |
0 |
AM |
75 |
|
638 |
WHIP |
WATER AND SEDIMENT CONTROL BASIN |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
638 |
WHIP |
WATER AND SEDIMENT CONTROL BASIN |
Water and Sediment Control Basin |
no |
0 |
AM |
75 |
|
643 |
WHIP |
RESTORATION AND MANAGEMENT OF DECLINING HABITATS |
Restoration and Management of Declining Species |
ac |
0 |
AM |
75 |
|
643 |
WHIP |
RESTORATION AND MANAGEMENT OF DECLINING HABITATS |
Management (Non Cost-shared) |
ac |
0 |
NC |
0 |
|
644 |
WHIP |
WETLAND WILDLIFE HABITAT MANAGEMENT |
Management |
ac |
100 |
AM |
75 |
|
644 |
WHIP |
WETLAND WILDLIFE HABITAT MANAGEMENT |
Management (Non Cost-shared) |
ac |
0 |
NC |
0 |
|
645 |
WHIP |
UPLAND WILDLIFE HABITAT MANAGEMENT |
Management |
ac |
0 |
AM |
75 |
|
645 |
WHIP |
UPLAND WILDLIFE HABITAT MANAGEMENT |
Management (Non Cost-shared) |
ac |
0 |
NC |
0 |
|
646 |
WHIP |
SHALLOW WATER MANAGEMENT FOR WILDLIFE |
Shallow Water Management For Wildlife |
ac |
4800 |
FR |
100 |
|
646 |
WHIP |
SHALLOW WATER MANAGEMENT FOR WILDLIFE |
Management (Non Cost-shared) |
ac |
0 |
NC |
0 |
|
657 |
WHIP |
WETLAND RESTORATION |
Earthwork, haul fee |
no |
500 |
AM |
75 |
|
657 |
WHIP |
WETLAND RESTORATION |
Wetland Restoration |
ac |
0 |
AM |
75 |
|
658 |
WHIP |
WETLAND CREATION |
Wetland Creation |
ac |
0 |
AM |
75 |
|
658 |
WHIP |
WETLAND CREATION |
Earthwork, haul fee |
no. |
500 |
AM |
75 |
|
659 |
WHIP |
WETLAND ENHANCEMENT |
Wetland Enhancement |
ac. |
0 |
AM |
75 |
|
659 |
WHIP |
WETLAND ENHANCEMENT |
Earthwork, haul fee |
no. |
500 |
AM |
75 |
|
666 |
WHIP |
FOREST STAND IMPROVEMENT |
Forest Stand Improvement |
ac. |
500 |
AM |
75 |
|
910 |
WHIP |
TECHNICAL ASSISTANCE REIMBURSEMENT FOR PLANNING |
TA-Planning |
no. |
0 |
AM |
100 |
|
911 |
WHIP |
TECHNICAL ASSISTANCE REIMBURSEMENT FOR DESIGN
|
TA-Design |
no. |
0 |
AM |
100 |
|
912 |
WHIP |
TECHNICAL ASSISTANCE REIMBURSEMENT FOR APPLICATION
|
TA-Application |
no. |
0 |
AM |
100 |
|
913 |
WHIP |
TECHNICAL ASSISTANCE REIMBURSEMENT FOR INSTALLATION CHECK-OUT
|
TA-Installation Check-Out |
no. |
0 |
AM |
100 |