Shared Top Border
Hawaii

01/24/05

 

FY-2005 WHIP 15-Year Practice Component Cost List

 Practice
Code
Cost_Share
Program
Practice_Name Component Unit
Type
Unit
Cost
Cost
Type
Share
Rate
314 WHIP BRUSH MANAGEMENT Earthwork, Haul Fee no. 500 AM 100
314 WHIP BRUSH MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
314 WHIP BRUSH MANAGEMENT Brush Management (Dense, Woody) ac. 0 AM 100
317 WHIP COMPOSTING FACILITY Composting Facility no. 0 AM 100
324 WHIP DEEP TILLAGE Deep Tillage ac. 100 AM 100
324 WHIP DEEP TILLAGE Earthwork, Haul Fee no. 500 AM 100
327 WHIP CONSERVATION COVER Earthwork, Haul Fee no. 500 AM 100
327 WHIP CONSERVATION COVER Conservation Cover, Native Plants ac. 1400 AM 100
328 WHIP CONSERVATION CROP ROTATION Earthwork, Haul Fee no. 500 AM 100
328 WHIP CONSERVATION CROP ROTATION Conservation Crop Rotation, Native Plants ac. 1400 AM 100
340 WHIP COVER CROP Earthwork, Haul Fee no. 500 AM 100
340 WHIP COVER CROP Cover Crop ac. 1400 AM 100
342 WHIP CRITICAL AREA PLANTING Earthwork, Haul Fee no. 500 AM 100
342 WHIP CRITICAL AREA PLANTING Critical Area Planting, Native Plants ac. 1400 AM 100
344 WHIP RESIDUE MANAGEMENT, SEASONAL Residue Management, Seasonal ac. 100 AM 100
344 WHIP RESIDUE MANAGEMENT, SEASONAL Management (Non Cost-shared) ac. 0 NC 0
350 WHIP SEDIMENT BASIN Sediment Basin no. 0 AM 100
350 WHIP SEDIMENT BASIN Earthwork, haul fee no. 500 AM 100
362 WHIP DIVERSION Diversion ft. 8 AM 100
362 WHIP DIVERSION Earthwork, Haul Fee no. 500 AM 100
378 WHIP POND Pond no. 0 AM 100
378 WHIP POND Earthwork, haul fee no. 500 AM 100
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Earthwork, Haul Fee no. 500 AM 100
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Windbreak/Shelterbelt Establishment, Native Plants, Single Row ft. 2.35 AM 100
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Windbreak/Shelterbelt Establishment, Native Plants, Double Row ft. 4.70 AM 100
382 WHIP FENCE Fence (Non-electric, Barbed Wire - Rock) ft. 10.50 AM 100
382 WHIP FENCE Fence (Non-electric, Barbed Wire - Soil) ft. 7.50 AM 100
382 WHIP FENCE Fence (Non-electric, Woven Wire - Rock) ft. 11.00 AM 100
382 WHIP FENCE Fence (Non-electric, Woven Wire - Soil) ft. 9.00 AM 100
382 WHIP FENCE Fence, Electric (Rock) ft. 6.90 AM 100
382 WHIP FENCE Fence, Electric (Soil) ft. 5.50 AM 100
382 WHIP FENCE Fence, Game-Proof ft. 12.00 AM 100
382 WHIP FENCE Fence, Power Source, Solar no. 1600 AM 100
388 WHIP IRRIGATION FIELD DITCH Irrigation Field Ditch ft. 8 AM 100
388 WHIP IRRIGATION FIELD DITCH Earthwork, Haul Fee no. 500 AM 100
391 WHIP RIPARIAN FOREST BUFFER Riparian Forest Buffer ac. 3000 AM 100
391 WHIP RIPARIAN FOREST BUFFER Earthwork, haul fee no. 500 AM 100
393 WHIP FILTER STRIP Earthwork, Haul Fee no. 500 AM 100
393 WHIP FILTER STRIP Filter Strip ac. 1400 AM 100
394 WHIP FIREBREAK Earthwork, Haul Fee no. 500 AM 100
394 WHIP FIREBREAK Firebreak ft. 8.00 AM 100
410 WHIP GRADE STABILIZATION STRUCTURE Earthwork, Haul Fee no. 500 AM 100
410 WHIP GRADE STABILIZATION STRUCTURE Grade Stabilization Structure no. 0 AM 100
412 WHIP GRASSED WATERWAY Earthwork, Haul Fee no. 500 AM 100
412 WHIP GRASSED WATERWAY Grassed Waterway ac. 17,500 AM 100
422 WHIP HEDGEROW PLANTING Hedgerow Planting, Native Plants no. 20.00 AM 100
423 WHIP HILLSIDE DITCH Hillside Ditch ft. 4 AM 100
423 WHIP HILLSIDE DITCH Earthwork, Haul Fee no. 500 AM 100
430DD WHIP IRRIGATION WATER CONVEYANCE, PIPELINE, HIGH-PRESSURE, UNDERGROUND, PLASTIC Irrigation Water Conveyance, Pipeline, High-Pressure, Underground, Plastic ft. 6 AM 100
430FF WHIP IRRIGATION WATER CONVEYANCE, PIPELINE, STEEL Irrigation Water Conveyance, Pipeline, Steel ft. 6 AM 100
436 WHIP IRRIGATION STORAGE RESERVOIR Irrigation Storage Reservoir no. 0 AM 100
436 WHIP IRRIGATION STORAGE RESERVOIR Earthwork, Haul Fee no. 500 AM 100
441 WHIP IRRIGATION SYSTEM, MICROIRRIGATION Irrigation System, Microirrigation no. 0 AM 100
442 WHIP IRRIGATION SYSTEM, SPRINKLER Irrigation System, Sprinkler no. 0 AM 100
449 WHIP IRRIGATION WATER MANAGEMENT Management ac. 100 AM 100
449 WHIP IRRIGATION WATER MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
468 WHIP LINED WATERWAY OR OUTLET Earthwork, Haul Fee no. 500 AM 100
468 WHIP LINED WATERWAY OR OUTLET Lined Waterway or Outlet ft. 0 AM 100
472 WHIP USE EXCLUSION Use Exclusion, Non-Fence ac. 0 AM 100
484 WHIP MULCHING Mulching ac. 0 AM 100
490 WHIP FOREST SITE PREPARATION Earthwork, Haul Fee no. 500 AM 100
490 WHIP FOREST SITE PREPARATION Forest Site Preparation ac. 0 AM 100
516 WHIP PIPELINE Pipeline (2 Inches In Diameter Or Less) ft. 4 AM 100
516 WHIP PIPELINE Pipeline (More Than 2 Inches In Diameter) ft. 6 AM 100
521A WHIP POND SEALING OR LINING, FLEXIBLE MEMBRANE Pond Sealing or Lining, Flexible Membrane no. 0 AM 100
528A WHIP PRESCRIBED GRAZING Management ac. 100 AM 100
528A WHIP PRESCRIBED GRAZING Management (Non Cost-shared) ac. 0 NC 0
550 WHIP RANGE PLANTING Earthwork, Haul Fee no. 500 AM 100
550 WHIP RANGE PLANTING Range Planting ac. 1400 AM 100
558 WHIP ROOF RUNOFF STRUCTURE Roof Runoff Structure no. 0 AM 100
560 WHIP ACCESS ROAD Access Road ft. 20 AM 100
560 WHIP ACCESS ROAD Earthwork, haul fee no. 500 AM 100
568 WHIP RECREATION TRAIL AND WALKWAY Recreation Trail and Walkway ft. 8 AM 100
568 WHIP RECREATION TRAIL AND WALKWAY Earthwork, Haul Fee no. 500 AM 100
580 WHIP STREAMBANK AND SHORELINE PROTECTION Streambank And Shoreline Protection ft. 0 AM 100
580 WHIP STREAMBANK AND SHORELINE PROTECTION Earthwork, Haul Fee no. 500 AM 100
582 WHIP OPEN CHANNEL Earthwork, haul fee no. 500 AM 100
582 WHIP OPEN CHANNEL Open Channel ft. 8 AM 100
587 WHIP STRUCTURE FOR WATER CONTROL Structure For Water Control no. 0 AM 100
587 WHIP STRUCTURE FOR WATER CONTROL Earthwork, haul fee no. 500 AM 100
590 WHIP NUTRIENT MANAGEMENT Nutrient Management ac. 100 AM 100
590 WHIP NUTRIENT MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
595 WHIP PEST MANAGEMENT Earthwork, haul fee no. 500 AM 100
595 WHIP PEST MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
595 WHIP PEST MANAGEMENT Management ac. 0 AM 100
600 WHIP TERRACE Terrace ft. 8 AM 100
600 WHIP TERRACE Earthwork, haul fee no. 500 AM 100
601 WHIP VEGETATIVE BARRIER Earthwork, Haul Fee no. 500 AM 100
601 WHIP VEGETATIVE BARRIER Vegetative Barrier ft. 4.00 AM 100
612 WHIP TREE/SHRUB ESTABLISHMENT Earthwork, Haul Fee no. 500 AM 100
612 WHIP TREE/SHRUB ESTABLISHMENT Vegetative Cover, Native Plants ac. 5000 AM 100
614 WHIP WATERING FACILITY Watering Facility, Tank no. 0 AM 100
614 WHIP WATERING FACILITY Watering Facility, Trough no. 0 AM 100
636 WHIP WATER HARVESTING CATCHMENT Water Harvesting Catchment no. 0 AM 100
638 WHIP WATER AND SEDIMENT CONTROL BASIN Earthwork, Haul Fee no. 500 AM 100
638 WHIP WATER AND SEDIMENT CONTROL BASIN Water and Sediment Control Basin no. 0 AM 100
643 WHIP RESTORATION AND MANAGEMENT OF DECLINING HABITATS Restoration and Management of Declining Species ac. 0 AM 100
643 WHIP RESTORATION AND MANAGEMENT OF DECLINING HABITATS Management (Non Cost-shared) ac. 0 NC 0
644 WHIP WETLAND WILDLIFE HABITAT MANAGEMENT Management ac. 100 AM 100
644 WHIP WETLAND WILDLIFE HABITAT MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
645 WHIP UPLAND WILDLIFE HABITAT MANAGEMENT Management ac. 0 AM 100
645 WHIP UPLAND WILDLIFE HABITAT MANAGEMENT Management (Non Cost-shared) ac. 0 NC 0
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Shallow Water Management For Wildlife ac.. 4800 FR 100
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Management (Non Cost-shared) ac. 0 NC 0
657 WHIP WETLAND RESTORATION Earthwork, Haul Fee no. 500 AM 100
657 WHIP WETLAND RESTORATION Wetland Restoration ac. 0 AM 100
658 WHIP WETLAND CREATION Wetland Creation ac. 0 AM 100
658 WHIP WETLAND CREATION Earthwork, Haul Fee no. 500 AM 100
659 WHIP WETLAND ENHANCEMENT Wetland Enhancement ac. 0 AM 100
659 WHIP WETLAND ENHANCEMENT Earthwork, Haul Fee no. 500 AM 100
666 WHIP FOREST STAND IMPROVEMENT Forest Stand Improvement ac. 500 AM 100
910 WHIP TECHNICAL ASSISTANCE REIMBURSEMENT FOR PLANNING TA - Planning no. 0 AM 100
911 WHIP TECHNICAL ASSISTANCE REIMBURSEMENT FOR DESIGN TA - Design no. 0 AM 100
912 WHIP TECHNICAL ASSISTANCE REIMBURSEMENT FOR APPLICATION TA - Application no. 0 AM 100
913 WHIP TECHNICAL ASSISTANCE REIMBURSEMENT FOR INSTALLATION CHECK-OUT TA - Installation Check-Out no. 0 AM 100