Shared Top Border
USDA Conservation Programs

03/01/04

 

FY-2003 Labor and Equipment Rates

 Practice
Code
Cost_Share
Program
Practice_Name Component Unit
Type
Unit
Cost
Cost
Type
Share
Rate
314 WHIP BRUSH MANAGEMENT Control, Chemical ac 160 AM 75
314 WHIP BRUSH MANAGEMENT Control, Heavy Equipment ac. 280 AM 75
314 WHIP BRUSH MANAGEMENT Control, Light Equipment ac. 160 AM 75
314 WHIP BRUSH MANAGEMENT Control, Special ac. 0 AM 75
314 WHIP BRUSH MANAGEMENT Earthwork, haul fee no. 500 AM 75
317 WHIP COMPOSTING FACILITY Reception Pit no. 0 AM 75
324 WHIP DEEP TILLAGE Management ac. 100 AM 75
327 WHIP CONSERVATION COVER Earthwork, haul fee no. 500 AM 75
327 WHIP CONSERVATION COVER Vegetative Cover, seeds/sprigs ac. 1400 AM 75
328 WHIP CONSERVATION CROP ROTATION Management ac. 100 AM 75
340 WHIP COVER CROP Earthwork, haul fee no. 500 AM 75
340 WHIP COVER CROP Vegetative Cover, seeds/sprigs ac. 1400 AM 75
342 WHIP CRITICAL AREA PLANTING Earthwork, haul fee no. 500 AM 75
342 WHIP CRITICAL AREA PLANTING Erosion Control Mat ac. 0 AM 75
342 WHIP CRITICAL AREA PLANTING Irrigation System no. 0 AM 75
342 WHIP CRITICAL AREA PLANTING Vegetative Cover, Critical Area ac. 1400 AM 75
344 WHIP RESIDUE MANAGEMENT, SEASONAL Management ac. 100 AM 75
350 WHIP SEDIMENT BASIN Concrete and Riprap cy. 540 AM 75
350 WHIP SEDIMENT BASIN Earthwork no. 0 AM 75
350 WHIP SEDIMENT BASIN Earthwork, haul fee no. 500 AM 75
350 WHIP SEDIMENT BASIN Riser (outlet pipe) no. 0 AM 75
362 WHIP DIVERSION Earthwork ft. 8 AM 75
362 WHIP DIVERSION Earthwork, haul fee no. 500 AM 75
362 WHIP DIVERSION Erosion Control Mat ac. 0 AM 75
362 WHIP DIVERSION Vegetative Cover, Critical Area ac. 1400 AM 75
378 WHIP POND Earthwork no. 0 AM 75
378 WHIP POND Earthwork, haul fee no. 500 AM 75
378 WHIP POND Vegetative Cover, seeds/sprigs ac. 1400 AM 75
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Earthwork, haul fee no. 500 AM 75
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Irrigation Lateral ft. 0.40 AM 75
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Vegetative Cover, native plants no. 20.00 AM 75
380 WHIP WINDBREAK/SHELTERBELT ESTABLISHMENT Vegetative Cover, tree/shrub no. 3.20 AM 75
382 WHIP FENCE, NON-ELECTRIC Fence, Barbed Wire ft. 2.50 AM 75
382 WHIP FENCE, NON-ELECTRIC Fence, Woven Wire ft. 3.35 AM 75
382 WHIP FENCE, NON-ELECTRIC Fence, Electric ft. 2.10 AM 75
382 WHIP FENCE, NON-ELECTRIC Fence, Power Source no. 1600 AM 75
382 WHIP FENCE, NON-ELECTRIC Fence, Special ft. 12 AM 75
391 WHIP RIPARIAN FOREST BUFFER Earthwork ac. 300 AM 75
391 WHIP RIPARIAN FOREST BUFFER Earthwork, haul fee no. 500 AM 75
391 WHIP RIPARIAN FOREST BUFFER Fence, Barbed Wire ft. 2.50 AM 75
391 WHIP RIPARIAN FOREST BUFFER Fence, Electric ft. 2.10 AM 75
391 WHIP RIPARIAN FOREST BUFFER Fence, Special ft. 12 AM 75
391 WHIP RIPARIAN FOREST BUFFER Fence, Woven Wire ft. 3.35 AM 75
391 WHIP RIPARIAN FOREST BUFFER Irrigation Lateral ft. 0.40 AM 75
391 WHIP RIPARIAN FOREST BUFFER Pipe, 2 in. diameter or less ft. 4 AM 75
391 WHIP RIPARIAN FOREST BUFFER Pipe, more than 2 in. diameter ft. 0 AM 75
391 WHIP RIPARIAN FOREST BUFFER Tank no. 0 AM 75
391 WHIP RIPARIAN FOREST BUFFER Trough no. 0 AM 75
391 WHIP RIPARIAN FOREST BUFFER Vegetative Cover, native plants no. 20.00 AM 75
391 WHIP RIPARIAN FOREST BUFFER Vegetative Cover, seeds/sprigs ac. 1400 AM 75
391 WHIP RIPARIAN FOREST BUFFER Vegetative Cover, tree/shrub no. 3.20 AM 75
393 WHIP FILTER STRIP Earthwork, haul fee no. 500 AM 75
393 WHIP FILTER STRIP Vegetative Cover, seeds/sprigs ac. 1400 AM 75
394 WHIP FIREBREAK Earthwork ac. 300 AM 75
394 WHIP FIREBREAK Earthwork, haul fee no. 500 AM 75
394 WHIP FIREBREAK Irrigation Lateral ft. 0.40 AM 75
394 WHIP FIREBREAK Vegetative Cover, native plants no. 20.00 AM 75
394 WHIP FIREBREAK Vegetative Cover, seeds/sprigs ac. 1400 AM 75
394 WHIP FIREBREAK Vegetative Cover, tree/shrub no. 3.20 AM 75
410 WHIP GRADE STABILIZATION STRUCTURE Concrete and Riprap cy. 540 AM 75
410 WHIP GRADE STABILIZATION STRUCTURE Earthwork no. 0 AM 75
410 WHIP GRADE STABILIZATION STRUCTURE Earthwork, haul fee no. 500 AM 75
410 WHIP GRADE STABILIZATION STRUCTURE Erosion Control Mat ac. 0 AM 75
410 WHIP GRADE STABILIZATION STRUCTURE Vegetative Cover, Critical Area ac. 1400 AM 75
412 WHIP GRASSED WATERWAY Earthwork ac. 300 AM 75
412 WHIP GRASSED WATERWAY Earthwork, haul fee no. 500 AM 75
412 WHIP GRASSED WATERWAY Erosion Control Mat ac. 0 AM 75
412 WHIP GRASSED WATERWAY Vegetative Cover, Critical Area ac. 1400 AM 75
422 WHIP HEDGEROW PLANTING Irrigation Lateral ft. 0.40 AM 75
422 WHIP HEDGEROW PLANTING Vegetative Cover, native plants no. 20.00 AM 75
422 WHIP HEDGEROW PLANTING Vegetative Cover, tree/shrub no. 3.20 AM 75
423 WHIP HILLSIDE DITCH Earthwork ft. 0 AM 75
423 WHIP HILLSIDE DITCH Earthwork, haul fee no. 500 AM 75
430DD WHIP IRRIGATION WATER CONVEYANCE, PIPELINE, HIGH-PRESSURE, UNDERGROUND, PLASTIC Irrigation System no. 0 AM 75
430FF WHIP IRRIGATION WATER CONVEYANCE, PIPELINE, STEEL Irrigation System no. 0 AM 75
436 WHIP IRRIGATION STORAGE RESERVOIR Agitator, Permanent Pump no. 0 AM 75
436 WHIP IRRIGATION STORAGE RESERVOIR Concrete and Riprap cy. 540 AM 75
436 WHIP IRRIGATION STORAGE RESERVOIR Earthwork no. 0 AM 75
436 WHIP IRRIGATION STORAGE RESERVOIR Pipe, 2 in. diameter or less ft. 4 AM 75
436 WHIP IRRIGATION STORAGE RESERVOIR Pipe, more than 2 in. diameter ft. 0 AM 75
441 WHIP IRRIGATION SYSTEM, MICROIRRIGATION Irrigation System no. 0 AM 75
441 WHIP IRRIGATION SYSTEM, MICROIRRIGATION Irrigation System ac. 0 AM 75
442 WHIP IRRIGATION SYSTEM, SPRINKLER Irrigation System no. 0 AM 75
442 WHIP IRRIGATION SYSTEM, SPRINKLER Irrigation System ac. 0 AM 75
449 WHIP IRRIGATION WATER MANAGEMENT Management ac. 100 AM 75
468 WHIP LINED WATERWAY OR OUTLET Concrete and Riprap cy. 540 AM 75
468 WHIP LINED WATERWAY OR OUTLET Earthwork ft. 0 AM 75
468 WHIP LINED WATERWAY OR OUTLET Earthwork, haul fee no. 500 AM 75
472 WHIP USE EXCLUSION Control, Chemical ac. 160 AM 75
472 WHIP USE EXCLUSION Control, Special ac. 0 AM 75
472 WHIP USE EXCLUSION Control, traps/snares no. 0 AM 75
472 WHIP USE EXCLUSION Fence, Barbed Wire ft. 2.50 AM 75
472 WHIP USE EXCLUSION Fence, Electric ft. 2.10 AM 75
472 WHIP USE EXCLUSION Fence, Power Source no. 1600 AM 75
472 WHIP USE EXCLUSION Fence, Special ft. 12 AM 75
472 WHIP USE EXCLUSION Fence, Woven Wire ft. 3.35 AM 75
472 WHIP USE EXCLUSION Management ac. 0 AM 75
484 WHIP MULCHING Mulch Material ac. 0 AM 75
490 WHIP FOREST SITE PREPARATION Control, Chemical ac. 160 AM 75
490 WHIP FOREST SITE PREPARATION Control, Heavy Equipment ac. 280 AM 75
490 WHIP FOREST SITE PREPARATION Control, Light Equipment ac. 160 AM 75
490 WHIP FOREST SITE PREPARATION Earthwork ac. 300 AM 75
490 WHIP FOREST SITE PREPARATION Earthwork, haul fee no. 500 AM 75
512 WHIP PASTURE AND HAY PLANTING Earthwork, haul fee no. 500 AM 75
512 WHIP PASTURE AND HAY PLANTING Vegetative Cover, seeds/sprigs ac. 1400 AM 75
516 WHIP PIPELINE Pipe, 2 in. diameter or less ft. 4 AM 75
516 WHIP PIPELINE Pipe, more than 2 in. diameter ft. 0 AM 75
521A WHIP POND SEALING OR LINING, FLEXIBLE MEMBRANE Liner no. 0 AM 75
528A WHIP PRESCRIBED GRAZING Management ac. 100 AM 75
548 WHIP GRAZING LAND MECHANICAL TREATMENT Earthwork ac. 300 AM 75
548 WHIP GRAZING LAND MECHANICAL TREATMENT Earthwork, haul fee no. 500 AM 75
550 WHIP RANGE PLANTING Earthwork, haul fee no. 500 AM 75
550 WHIP RANGE PLANTING Vegetative Cover, seeds/sprigs ac. 1400 AM 75
552A WHIP IRRIGATION REGULATING RESERVOIR Earthwork no. 0 AM 75
552B WHIP IRRIGATION REGULATING RESERVOIR Concrete and Riprap cy. 540 AM 75
552B WHIP IRRIGATION REGULATING RESERVOIR Earthwork no. 0 AM 75
552B WHIP IRRIGATION REGULATING RESERVOIR Pipe, 2 in. diameter or less ft. 4 AM 75
552B WHIP IRRIGATION REGULATING RESERVOIR Pipe, more than 2 in. diameter ft. 0 AM 75
552B WHIP IRRIGATION REGULATING RESERVOIR Tank no. 0 AM 75
558 WHIP ROOF RUNOFF STRUCTURE Gutters no. 0 AM 75
560 WHIP ACCESS ROAD Earthwork ft. 0 AM 75
560 WHIP ACCESS ROAD Earthwork, haul fee no. 500 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Concrete and Riprap cy. 540 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Culvert, < or = 18" diam.; 20' long no. 400 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Culvert, > 36" diam.; 20' long no. 0 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Culvert, 24" - 36" diam.; 20' long no. 800 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Earthwork ft. 8 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Earthwork, haul fee no. 500 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Gravel cy. 56 AM 75
568 WHIP RECREATION TRAIL AND WALKWAY Walkways ft. 0 AM 75
582 WHIP OPEN CHANNEL Concrete and Riprap cy. 540 AM 75
582 WHIP OPEN CHANNEL Earthwork ft. 0 AM 75
582 WHIP OPEN CHANNEL Earthwork, haul fee no. 500 AM 75
582 WHIP OPEN CHANNEL Vegetative Cover, seeds/sprigs ac. 1400 AM 75
587 WHIP STRUCTURE FOR WATER CONTROL Concrete and Riprap cy. 540 AM 75
587 WHIP STRUCTURE FOR WATER CONTROL Earthwork no. 0 AM 75
587 WHIP STRUCTURE FOR WATER CONTROL Earthwork, haul fee no. 500 AM 75
587 WHIP STRUCTURE FOR WATER CONTROL Pipe, 2 in. diameter or less ft. 4 AM 75
587 WHIP STRUCTURE FOR WATER CONTROL Pipe, more than 2 in. diameter ft. 0 AM 75
590 WHIP NUTRIENT MANAGEMENT Management ac. 100 AM 75
595 WHIP PEST MANAGEMENT Control, Chemical ac. 160 AM 75
595 WHIP PEST MANAGEMENT Control, Special ac. 0 AM 75
595 WHIP PEST MANAGEMENT Earthwork, haul fee no. 500 AM 75
595 WHIP PEST MANAGEMENT Management ac. 100 AM 75
600 WHIP TERRACE Earthwork ft. 8 AM 75
600 WHIP TERRACE Earthwork, haul fee no. 500 AM 75
600 WHIP TERRACE Vegetative Cover, seeds/sprigs ac. 1400 AM 75
601 WHIP VEGETATIVE BARRIER Earthwork, ditch ft. 4 AM 75
601 WHIP VEGETATIVE BARRIER Earthwork, haul fee no. 500 AM 75
601 WHIP VEGETATIVE BARRIER Irrigation Lateral ft. 0.40 AM 75
601 WHIP VEGETATIVE BARRIER Vegetative Cover, Critical Area ac. 1400 AM 75
601 WHIP VEGETATIVE BARRIER Vegetative Cover, native plants no. 20.00 AM 75
601 WHIP VEGETATIVE BARRIER Vegetative Cover, tree/shrub no. 3.20 AM 75
612 WHIP TREE/SHRUB ESTABLISHMENT Earthwork, haul fee no. 500 AM 75
612 WHIP TREE/SHRUB ESTABLISHMENT Irrigation Lateral ft. 0.40 AM 75
612 WHIP TREE/SHRUB ESTABLISHMENT Vegetative Cover, native plants no. 20.00 AM 75
612 WHIP TREE/SHRUB ESTABLISHMENT Vegetative Cover, tree/shrub no. 3.20 AM 75
614 WHIP WATERING FACILITY Tank no. 0 AM 75
614 WHIP WATERING FACILITY Trough no. 0 AM 75
634 WHIP MANURE TRANSFER Pump, pIpe, scraper no. 0 AM 75
634 WHIP MANURE TRANSFER Reception Pit no. 0 AM 75
634 WHIP MANURE TRANSFER Tank no. 0 AM 75
636 WHIP WATER HARVESTING CATCHMENT Structure no. 0 AM 75
638 WHIP WATER AND SEDIMENT CONTROL BASIN Concrete and Riprap cy. 540 AM 75
638 WHIP WATER AND SEDIMENT CONTROL BASIN Earthwork no. 0 AM 75
638 WHIP WATER AND SEDIMENT CONTROL BASIN Earthwork, haul fee no. 500 AM 75
638 WHIP WATER AND SEDIMENT CONTROL BASIN Riser (outlet pipe) no. 0 AM 75
638 WHIP WATER AND SEDIMENT CONTROL BASIN Vegetative Cover, seeds/sprigs ac. 1400 AM 75
644 WHIP WETLAND WILDLIFE HABITAT MANAGEMENT Management ac. 100 AM 75
645 WHIP UPLAND WILDLIFE HABITAT MANAGEMENT Management ac. 0 AM 75
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Earthwork no. 0 AM 75
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Earthwork, haul fee no. 500 AM 75
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Erosion Control Mat ac. 0 AM 75
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Irrigation Lateral ft. 0.40 AM 75
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Vegetative Cover, Critical Area ac. 1400 AM 75
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Vegetative Cover, native plants no. 20.00 AM 75
646 WHIP SHALLOW  WATER MANAGEMENT FOR WILDLIFE Vegetative Cover, tree/shrub no. 3.20 AM 75
657 WHIP WETLAND RESTORATION Earthwork no. 0 AM 75
657 WHIP WETLAND RESTORATION Earthwork, haul fee no. 500 AM 75
657 WHIP WETLAND RESTORATION Erosion Control Mat ac. 0 AM 75
657 WHIP WETLAND RESTORATION Irrigation Lateral ft. 0.40 AM 75
657 WHIP WETLAND RESTORATION Vegetative Cover, Critical Area ac. 1400 AM 75
657 WHIP WETLAND RESTORATION Vegetative Cover, native plants no. 20.00 AM 75
657 WHIP WETLAND RESTORATION Vegetative Cover, tree/shrub no. 3.20 AM 75
658 WHIP WETLAND CREATION Earthwork no. 0 AM 75
658 WHIP WETLAND CREATION Earthwork, haul fee no. 500 AM 75
658 WHIP WETLAND CREATION Erosion Control Mat ac. 0 AM 75
658 WHIP WETLAND CREATION Irrigation Lateral ft. 0.40 AM 75
658 WHIP WETLAND CREATION Vegetative Cover, Critical Area ac. 1400 AM 75
658 WHIP WETLAND CREATION Vegetative Cover, native plants no. 20.00 AM 75
658 WHIP WETLAND CREATION Vegetative Cover, tree/shrub no. 3.20 AM 75
659 WHIP WETLAND ENHANCEMENT Earthwork no. 0 AM 75
659 WHIP WETLAND ENHANCEMENT Earthwork, haul fee no. 500 AM 75
659 WHIP WETLAND ENHANCEMENT Erosion Control Mat ac. 0 AM 75
659 WHIP WETLAND ENHANCEMENT Irrigation Lateral ft. 0.40 AM 75
659 WHIP WETLAND ENHANCEMENT Vegetative Cover, Critical Area ac. 1400 AM 75
659 WHIP WETLAND ENHANCEMENT Vegetative Cover, native plants no. 20.00 AM 75
659 WHIP WETLAND ENHANCEMENT Vegetative Cover, tree/shrub no. 3.20 AM 75
666 WHIP FOREST STAND IMPROVEMENT Management ac. 100 AM 75