Shared Top Border
USDA Conservation Programs

FY-2003 Hold Down Rates

Code Component Unit Actual
Cost NTE
Max C/S
Level
Max C/S
Amt
Comments
2C1 Control, heavy eq ac $280.00 75% $210.00  
2C2 Control, light eq ac $160.00 75% $120.00  
2C3 Control, chemical ac $160.00 75% $120.00  
2C4 Control, special ac n/a 75% 75% actual  
2C5 Control, traps/snares ea n/a 75% 75% actual  
             
2E1 Earthwork (acre) ac $280.00 75% $210.00  
2E2 Earthwork (ft) ft $7.00 75% $5.25  
2E3 Earthwork, ditch (ft) ft $4.00 75% $3.00  
2E4 Earthwork (no) no n/a 75% 75% actual  
2E5 Earthwork, haul fee ea $500.00 75% $375.00  
             
2F1 Fence, woven ft $3.20 75% $2.40  
2F2 Fence, barb ft $2.40 75% $1.80  
2F3 Fence, electric ft $2.00 75% $1.50  
2F4 Fence, power source
(CRP, WHIP, WRP)
ea $1,600.00 75% $1,200.00  
2F5 Fence, special ft $12.00 75% $9.00  
             
2L1 Irrigation Lateral ft $0.40 75% $0.30 lateral pipes
2L2 Irrigation System no n/a 75% 75% actual main, submain,
lateral, sprinkler,
emitters
             
2M1 Management ac $100.00 100% $100.00  
2M2 Management ac $50.00 100% $50.00  
2M3 Management ac $25.00 100% $25.00  
2M4 Management (taro) ac $750.00 100% $750.00  
2M5 Management (CRP, WHIP, WRP) ac n/a 75% 75% actual  
             
2P1 Pipe, < or = 2" diam. ft $4.00 75% $3.00  
2P2 Pipe, > 2" diameter ft n/a 75% 75% actual  
2P3 Tank ea n/a 75% 75% actual  
2P4 Trough ea n/a 75% 75% actual  
2P5 Water Harvesting Catchment ea n/a 75% 75% actual  
             
2S1 Concrete & Riprap cy $540.00 75% $405.00  
2S2 Gravel cy $56.00 75% $42.00  
2S3 Culvert, < or = 18" diam; 20' long ea $400.00 75% $300.00  
2S4 Culvert,  24" - 36" diam; 20' long ea $800.00 75% $600.00  
2S5 Culvert, > 36" diam; 20' long ea n/a 75% 75% actual  
2S6 Geotextile Fabric sf n/a 75% 75% actual  
2S7 Pond Lining sf n/a 75% 75% actual  
2S8 Riser (outlet pipe) ea n/a 75% 75% actual  
2S9 Walkways ft n/a 75% 75% actual  
             
2V1 Veg Cover, seeds/sprigs ac $1,400.00 75% $1,050.00 site prep, fert,
lime, plant materials
2V2 Veg Cover, tree/shrub ea $3.20 75% $2.40 site prep, fert,
lime, plant materials
2V3 Veg Cover, native plants ea $20.00 75% $15.00 site prep, fert,
lime, plant materials
2V4 Veg Cover, cane ft $1.20 75% $0.90 site prep, fert,
lime, plant materials
2V5 Veg Cover, critical area sf $0.60 75% $0.45 site prep, fert,
lime, plant materials
2V6 Erosion Control Mat sf n/a 75% 75% actual  
2V7 Mulch Material cy $15.00 75% $11.25  
             
2W1 Tank ea n/a 75% 75% actual  
2W2 Reception Pit ea n/a 75% 75% actual  
2W3 Pump, Pipe, Scraper ea n/a 75% 75% actual  
2W4 Solids Separator ea n/a 75% 75% actual manual or automatic
2W5 Aerator, Pond ea n/a 75% 75% actual  
2W6 Roof, Storage Bldg. ea n/a 75% 75% actual  
2W7 Compost Bldg., Structure ea n/a 75% 75% actual  
2W8 Agitator, Perm. Pump ea n/a 75% 75% actual  
2W9 Spreader ea n/a 75% 75% actual detached solid or
liquid
2W10 Gutters ft $6.00 75% $4.50  


(01/07/03)