USDA Conservation Programs
FY-2003 List of Practice Components
|
Practice Name |
Pract
Code |
Comp Code |
Component |
Unit |
Actual Cost NTE |
Max
C/S |
Max C/S Amt |
|
Access Road |
560 |
2E2 |
Earthwork (ft) |
ft |
$7.00 |
75% |
$5.25 |
|
Access Road |
560 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Access Road |
560 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
Access Road |
560 |
2S2 |
Gravel |
cy |
$56.00 |
75% |
$42.00 |
|
Access Road |
560 |
2S3 |
Culvert, < or = 18" diam; 20' long |
ea |
$400.00 |
75% |
$300.00 |
|
Access Road |
560 |
2S4 |
Culvert, 24" - 36" diam; 20' long |
ea |
$800.00 |
75% |
$600.00 |
|
Access Road |
560 |
2S5 |
Culvert, > 36" diam; 20' long |
ea |
n/a |
75% |
75% actual |
|
Access Road |
560 |
2S6 |
Geotextile Fabric |
sf |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Brush Management |
314 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Brush Management |
314 |
2C1 |
Control, heavy eq |
ac |
$280.00 |
75% |
$210.00 |
|
Brush Management |
314 |
2C2 |
Control, light eq |
ac |
$160.00 |
75% |
$120.00 |
|
Brush Management |
314 |
2C3 |
Control, chemical |
ac |
$160.00 |
75% |
$120.00 |
|
Brush Management |
314 |
2C4 |
Control, special |
ac |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Composting Facility |
317 |
2W02 |
Reception Pit |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Conservation Cover |
327 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
|
|
|
|
|
|
|
|
|
Brush Management |
314 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Brush Management |
314 |
2C1 |
Control, heavy eq |
ac |
$280.00 |
75% |
$210.00 |
|
Brush Management |
314 |
2C2 |
Control, light eq |
ac |
$160.00 |
75% |
$120.00 |
|
Brush Management |
314 |
2C3 |
Control, chemical |
ac |
$160.00 |
75% |
$120.00 |
|
Brush Management |
314 |
2C4 |
Control, special |
ac |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Composting Facility |
317 |
2W02 |
Reception Pit |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Conservation Cover |
327 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Conservation Cover |
327 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
|
|
|
|
|
|
|
|
|
Conservation Crop Rotation |
328 |
2M1 |
Management |
ac |
$100.00 |
100% |
$100.00 |
|
|
|
|
|
|
|
|
|
|
Contour Farming |
330 |
2M1 |
Management |
ac |
$100.00 |
100% |
$100.00 |
|
|
|
|
|
|
|
|
|
|
Contour Orchard |
331 |
2M1 |
Management |
ac |
$100.00 |
100% |
$100.00 |
|
|
|
|
|
|
|
|
|
|
Cover Crop |
340 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Cover Crop |
340 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
|
|
|
|
|
|
|
|
|
Critical Area Planting |
342 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Critical Area Planting |
342 |
2L2 |
Irrigation System |
no |
n/a |
75% |
75% actual |
|
Critical Area Planting |
342 |
2V5 |
Veg Cover, critical area |
sf |
$0.60 |
75% |
$0.45 |
|
Critical Area Planting |
342 |
2V6 |
Erosion Control Mat |
sf |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Deep Tillage |
324 |
2M3 |
Management |
ac |
$25.00 |
100% |
$25.00 |
|
|
|
|
|
|
|
|
|
|
Diversion |
362 |
2E2 |
Earthwork (ft) |
ft |
$7.00 |
75% |
$5.25 |
|
Diversion |
362 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Diversion |
362 |
2V5 |
Veg Cover, critical area |
sf |
$0.60 |
75% |
$0.45 |
|
Diversion |
362 |
2V6 |
Erosion Control Mat |
sf |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Fence |
382A |
2F1 |
Fence, woven |
ft |
$3.20 |
75% |
$2.40 |
|
Fence |
382A |
2F2 |
Fence, barb |
ft |
$2.40 |
75% |
$1.80 |
|
Fence |
382B |
2F3 |
Fence, electric |
ft |
@2.00 |
75% |
$1.50 |
|
Fence |
382B |
2F4 |
Fence, power source (CRP,
WHIP, WRP) |
ea |
$1,600.00 |
75% |
$1,200.00 |
|
Fence |
382C |
2F5 |
Fence, special |
ft |
$12.00 |
75% |
$9.00 |
| |
|
|
|
|
|
|
|
|
Filter Strip |
393 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Filter Strip |
393 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
|
|
|
|
|
|
|
|
|
Firebreak |
394 |
2E1 |
Earthwork (acre) |
ac |
$280.00 |
75% |
$210.00 |
|
Firebreak |
394 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Firebreak |
394 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
Firebreak |
394 |
2V2 |
Veg Cover, tree/shrub |
ea |
$3.20 |
75% |
$2.40 |
|
Firebreak |
394 |
2V3 |
Veg Cover, native plants |
ea |
$20.00 |
75% |
$15.00 |
|
Firebreak |
394 |
2V4 |
Veg Cover, cane |
ft |
$1.20 |
75% |
$0.90 |
|
Firebreak |
394 |
2L1 |
Irrigation Lateral |
ft |
$0.40 |
75% |
$0.30 |
|
|
|
|
|
|
|
|
|
|
Forest Site Preparation |
490 |
2E1 |
Earthwork (acre) |
ac |
$280.00 |
75% |
$210.00 |
|
Forest Site Preparation |
490 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Forest Site Preparation |
490 |
2C1 |
Control, heavy eq |
ac |
$280.00 |
75% |
$210.00 |
|
Forest Site Preparation |
490 |
2C2 |
Control, light eq |
ac |
$160.00 |
75% |
$120.00 |
|
Forest Site Preparation |
490 |
2C3 |
Control, chemical |
ac |
$160.00 |
75% |
$120.00 |
|
|
|
|
|
|
|
|
|
|
Forest Stand Improvement |
666 |
2M1 |
Management |
ac |
$100.00 |
100% |
$100.00 |
|
|
|
|
|
|
|
|
|
|
Grade Stabilization Structure |
410 |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Grade Stabilization Structure |
410 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Grade Stabilization Structure |
410 |
2V5 |
Veg Cover, critical area |
sf |
$0.60 |
75% |
$0.45 |
|
Grade Stabilization Structure |
410 |
2V6 |
Erosion Control Mat |
sf |
n/a |
75% |
75% actual |
|
Grade Stabilization Structure |
410 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
|
|
|
|
|
|
|
|
|
Grassed Waterway |
412 |
2E2 |
Earthwork (ft) |
ft |
$7.00 |
75% |
$5.25 |
|
Grassed Waterway |
412 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Grassed Waterway |
412 |
2V5 |
Veg Cover, critical area |
sf |
$0.60 |
75% |
$0.45 |
|
Grassed Waterway |
412 |
2V6 |
Erosion Control Mat |
sf |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Grazing Land Mech Treatment |
548 |
2E1 |
Earthwork (acre) |
ac |
$280.00 |
75% |
$210.00 |
|
Grazing Land Mech Treatment |
548 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
|
|
|
|
|
|
|
|
|
Hedgerow Planting |
422 |
2V2 |
Veg Cover, tree/shrub |
ea |
$3.20 |
75% |
$2.40 |
|
Hedgerow Planting |
422 |
2V3 |
Veg Cover, native plants |
ea |
$20.00 |
75% |
$15.00 |
|
Hedgerow Planting |
422 |
2V4 |
Veg Cover, cane |
ft |
$1.20 |
75% |
$0.90 |
|
Hedgerow Planting |
422 |
2L1 |
Irrigation Lateral |
ft |
$0.40 |
75% |
$0.30 |
|
|
|
|
|
|
|
|
|
|
Hillside Ditch |
423 |
2E3 |
Earthwork, ditch (ft) |
ft |
$4.00 |
75% |
$3.00 |
|
Hillside Ditch |
423 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
|
|
|
|
|
|
|
|
|
Irrigation Pit or Reg. Reservoir |
552A |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Irrigation Pit or Reg. Reservoir |
552B |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
Irrigation Pit or Reg. Reservoir |
552B |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Irrigation Pit or Reg. Reservoir |
552B |
2P1 |
Pipe, < or = 2" diam. |
ft |
$4.00 |
75% |
$3.00 |
|
Irrigation Pit or Reg. Reservoir |
552B |
2P2 |
Pipe, > 2" diameter |
ft |
n/a |
75% |
75% actual |
|
Irrigation Pit or Reg. Reservoir |
552B |
2P3 |
Tank |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Irrigation Storage Reservoir |
436 |
2W08 |
Agitator, Perm. Pump |
ea |
n/a |
75% |
75% actual |
|
Irrigation Storage Reservoir |
436 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
Irrigation Storage Reservoir |
436 |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Irrigation Storage Reservoir |
436 |
2P1 |
Pipe, < or = 2" diam. |
ft |
$4.00 |
75% |
$3.00 |
|
Irrigation Storage Reservoir |
436 |
2P2 |
Pipe, > 2" diameter |
ft |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Irrigation System, Sprinkler |
442 |
2L2 |
Irrigation System |
no |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Irrigation System, Microirrigation |
441 |
2L2 |
Irrigation System |
no |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Irrig. Wat. Conv.-Plastic |
430DD |
2L2 |
Irrigation System |
no |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Irrig. Wat. Conv.-Steel |
430FF |
2L2 |
Irrigation System |
no |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Irrigation Water Management |
449 |
2M1 |
Management |
ac |
$100.00 |
100% |
$100.00 |
|
|
|
|
|
|
|
|
|
|
Lined Waterway or Outlet |
468 |
2E2 |
Earthwork (ft) |
ft |
$7.00 |
75% |
$5.25 |
|
Lined Waterway or Outlet |
468 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Lined Waterway or Outlet |
468 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
|
|
|
|
|
|
|
|
|
Manure Transfer |
634 |
2W01 |
Tank |
ea |
n/a |
75% |
75% actual |
|
Manure Transfer |
634 |
2W02 |
Reception Pit |
ea |
n/a |
75% |
75% actual |
|
Manure Transfer |
634 |
2W03 |
Pump, Pipe, Scraper |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Mulching |
484 |
2V7 |
Mulch Material |
cy |
$15.00 |
75% |
$11.25 |
|
|
|
|
|
|
|
|
|
|
Nutrient Management |
590 |
2M1 |
Management |
ac |
$100.00 |
100% |
$100.00 |
|
|
|
|
|
|
|
|
|
|
Open Channel |
582 |
2E2 |
Earthwork (ft) |
ft |
$7.00 |
75% |
$5.25 |
|
Open Channel |
582 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Open Channel |
582 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
Open Channel |
582 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
|
|
|
|
|
|
|
|
|
Pasture & Hayland Planting |
512 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Pasture & Hayland Planting |
512 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
|
|
|
|
|
|
|
|
|
Pest Management |
595 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Pest Management |
595 |
2C1 |
Control, heavy eq |
ac |
$280.00 |
75% |
$210.00 |
|
Pest Management |
595 |
2C2 |
Control, light eq |
ac |
$160.00 |
75% |
$120.00 |
|
Pest Management |
595 |
2C3 |
Control, chemical |
ac |
$160.00 |
75% |
$120.00 |
|
Pest Management |
595 |
2C4 |
Control, special |
ac |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Pipeline |
516 |
2P1 |
Pipe, < or = 2" diam. |
ft |
$4.00 |
75% |
$3.00 |
|
Pipeline |
516 |
2P2 |
Pipe, > 2" diameter |
ft |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Pond |
378 |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Pond |
378 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Pond |
378 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
|
|
|
|
|
|
|
|
|
Pond, Sealing or Lining |
521A |
2S7 |
Pond Lining |
sf |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Prescribed Grazing |
528A |
2M2 |
Management |
ac |
$50.00 |
100% |
$50.00 |
|
|
|
|
|
|
|
|
|
|
Range Planting |
550 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Range Planting |
550 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
|
|
|
|
|
|
|
|
|
Recreation Trail & Walkway |
568 |
2E2 |
Earthwork (ft) |
ft |
$7.00 |
75% |
$5.25 |
|
Recreation Trail & Walkway |
568 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Recreation Trail & Walkway |
568 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
Recreation Trail & Walkway |
568 |
2S2 |
Gravel |
cy |
$56.00 |
75% |
$42.00 |
|
Recreation Trail & Walkway |
568 |
2S3 |
Culvert, < or = 18" diam; 20' long |
ea |
$400.00 |
75% |
$300.00 |
|
Recreation Trail & Walkway |
568 |
2S4 |
Culvert, 24" - 36" diam; 20' long |
ea |
$800.00 |
75% |
$600.00 |
|
Recreation Trail & Walkway |
568 |
2S5 |
Culvert, > 36" diam; 20' long |
ea |
n/a |
75% |
75% actual |
|
Recreation Trail & Walkway |
568 |
2S9 |
Walkways |
ft |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Residue Management, Seasonal |
344 |
2M1 |
Management |
ac |
$100.00 |
100% |
$100.00 |
| |
|
|
|
|
|
|
|
|
Riparian Forest Buffer |
391 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Riparian Forest Buffer |
391 |
2F1 |
Fence, woven |
ft |
$3.20 |
75% |
$2.40 |
|
Riparian Forest Buffer |
391 |
2F2 |
Fence, barb |
ft |
$2.40 |
75% |
$1.80 |
|
Riparian Forest Buffer |
391 |
2F3 |
Fence, electric |
ft |
$2.00 |
75% |
$1.50 |
|
Riparian Forest Buffer |
391 |
2F5 |
Fence, special |
ft |
$12.00 |
75% |
$9.00 |
|
Riparian Forest Buffer |
391 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
Riparian Forest Buffer |
391 |
2V2 |
Veg Cover, tree/shrub |
ea |
$3.20 |
75% |
$2.40 |
|
Riparian Forest Buffer |
391 |
2V3 |
Veg Cover, native plants |
ea |
$20.00 |
75% |
$15.00 |
|
Riparian Forest Buffer |
391 |
2V4 |
Veg Cover, cane |
ft |
$1.20 |
75% |
$0.90 |
|
Riparian Forest Buffer |
391 |
2L1 |
Irrigation Lateral |
ft |
$0.40 |
75% |
$0.30 |
|
Riparian Forest Buffer |
391 |
2P1 |
Pipe, < or = 2" diam. |
ft |
$4.00 |
75% |
$3.00 |
|
Riparian Forest Buffer |
391 |
2P2 |
Pipe, > 2" diameter |
ft |
n/a |
75% |
75% actual |
|
Riparian Forest Buffer |
391 |
2P3 |
Tank |
ea |
n/a |
75% |
75% actual |
|
Riparian Forest Buffer |
391 |
2P4 |
Trough |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Roof Runoff Structure |
558 |
2W10 |
Gutters |
ft |
$6.00 |
75% |
$4.50 |
|
|
|
|
|
|
|
|
|
|
Sediment Basin |
350 |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Sediment Basin |
350 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Sediment Basin |
350 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
Sediment Basin |
350 |
2S8 |
Riser (outlet pipe) |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Structure for Water Control |
587 |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Structure for Water Control |
587 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Structure for Water Control |
587 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
Structure for Water Control |
587 |
2P1 |
Pipe, < or = 2" diam. |
ft |
$4.00 |
75% |
$3.00 |
|
Structure for Water Control |
587 |
2P2 |
Pipe, > 2" diameter |
ft |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Terrace |
600 |
2E2 |
Earthwork (ft) |
ft |
$7.00 |
75% |
$5.25 |
|
Terrace |
600 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Terrace |
600 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
|
|
|
|
|
|
|
|
|
Tree/Shrub Establishment |
612 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Tree/Shrub Establishment |
612 |
2V2 |
Veg Cover, tree/shrub |
ea |
$3.20 |
75% |
$2.40 |
|
Tree/Shrub Establishment |
612 |
2V3 |
Veg Cover, native plants |
ea |
$20.00 |
75% |
$15.00 |
|
Tree/Shrub Establishment |
612 |
2V4 |
Veg Cover, cane |
ft |
$1.20 |
75% |
$0.90 |
|
Tree/Shrub Establishment |
612 |
2L1 |
Irrigation Lateral |
ft |
$0.40 |
75% |
$0.30 |
|
|
|
|
|
|
|
|
|
|
Upland Wildlife Habitat Mgmt |
645 |
2M2 |
Management |
ac |
$50.00 |
100% |
$50.00 |
|
Upland Wildlife Habitat Mgmt |
645 |
2M5 |
Management (CRP, WHIP, WRP) |
ac |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Use Exclusion |
472 |
2F1 |
Fence, woven |
ft |
$3.20 |
75% |
$2.40 |
|
Use Exclusion |
472 |
2F2 |
Fence, barb |
ft |
$2.40 |
75% |
$1.80 |
|
Use Exclusion |
472 |
2F3 |
Fence, electric |
ft |
$2.00 |
75% |
$1.50 |
|
Use Exclusion |
472 |
2F4 |
Fence, power source (CRP, WHIP, WRP) |
ea |
$1,600.00 |
75% |
$1,200.00 |
|
Use Exclusion |
472 |
2F5 |
Fence, special |
ft |
$12.00 |
75% |
$9.00 |
|
Use Exclusion |
472 |
2C3 |
Control, chemical |
ac |
$160.00 |
75% |
$120.00 |
|
Use Exclusion |
472 |
2C4 |
Control, special |
ac |
n/a |
75% |
75% actual |
|
Use Exclusion |
472 |
2C5 |
Control, traps/snares |
ea |
n/a |
75% |
75% actual |
|
Use Exclusion |
472 |
2M5 |
Management (CRP, WHIP, WRP) |
ac |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Vegetative Barrier |
601 |
2E3 |
Earthwork, ditch (ft) |
ft |
$4.00 |
75% |
$3.00 |
|
Vegetative Barrier |
601 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Vegetative Barrier |
601 |
2V2 |
Veg Cover, tree/shrub |
ea |
$3.20 |
75% |
$2.40 |
|
Vegetative Barrier |
601 |
2V3 |
Veg Cover, native plants |
ea |
$20.00 |
75% |
$15.00 |
|
Vegetative Barrier |
601 |
2V4 |
Veg Cover, cane |
ft |
$1.20 |
75% |
$0.90 |
|
Vegetative Barrier |
601 |
2L1 |
Irrigation Lateral |
ft |
$0.40 |
75% |
$0.30 |
|
|
|
|
|
|
|
|
|
|
Waste Storage Facility |
313 |
2W04 |
Solids Separator |
ea |
n/a |
75% |
75% actual |
|
Waste Storage Facility |
313 |
2W05 |
Aerator, Pond |
ea |
n/a |
75% |
75% actual |
|
Waste Storage Facility |
313 |
2W06 |
Roof, Storage Bldg. |
ea |
n/a |
75% |
75% actual |
|
Waste Storage Facility |
313 |
2W07 |
Compost Bldg., Structure |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Waste Treatment Lagoon |
359 |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Waste Treatment Lagoon |
359 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Waste Treatment Lagoon |
359 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
Waste Treatment Lagoon |
359 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
Waste Treatment Lagoon |
359 |
2S8 |
Riser (outlet pipe) |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Waste Utilization |
633 |
2W01 |
Tank |
ea |
n/a |
75% |
75% actual |
|
Waste Utilization |
633 |
2W08 |
Agitator, Perm. Pump |
ea |
n/a |
75% |
75% actual |
|
Waste Utilization |
633 |
2W09 |
Spreader |
ea |
n/a |
75% |
75% actual |
|
Waste Utilization |
633 |
2L2 |
Irrigation System |
no |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Water & Sediment Control Basin |
638 |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Water & Sediment Control Basin |
638 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Water & Sediment Control Basin |
638 |
2V1 |
Veg Cover, seeds/sprigs |
ac |
$1,400.00 |
75% |
$1,050.00 |
|
Water & Sediment Control Basin |
638 |
2S1 |
Concrete & Riprap |
cy |
$540.00 |
75% |
$405.00 |
|
Water & Sediment Control Basin |
638 |
2S8 |
Riser (outlet pipe) |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Water Harvesting Catchment |
636 |
2P5 |
Water Harvesting Catchment |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Watering Facility |
614 |
2P3 |
Tank |
ea |
n/a |
75% |
75% actual |
|
Watering Facility |
614 |
2P4 |
Trough |
ea |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Wetland Development or Restoration |
657 |
2E4 |
Earthwork (no) |
no |
n/a |
75% |
75% actual |
|
Wetland Development or Restoration |
657 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Wetland Development or Restoration |
657 |
2V2 |
Veg Cover, tree/shrub |
ea |
$3.20 |
75% |
$2.40 |
|
Wetland Development or Restoration |
657 |
2V3 |
Veg Cover, native plants |
ea |
$20.00 |
75% |
$15.00 |
|
Wetland Development or Restoration |
657 |
2V4 |
Veg Cover, cane |
ft |
$1.20 |
75% |
$0.90 |
|
Wetland Development or Restoration |
657 |
2L1 |
Irrigation Lateral |
ft |
$0.40 |
75% |
$0.30 |
|
Wetland Development or Restoration |
657 |
2V5 |
Veg Cover, critical area |
sf |
$0.60 |
75% |
$0.45 |
|
Wetland Development or Restoration |
657 |
2V6 |
Erosion Control Mat |
sf |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Wetland Wildlife Habitat Mgmt |
644 |
2M2 |
Management |
ac |
$50.00 |
100% |
$50.00 |
|
Wetland Wildlife Habitat Mgmt |
644 |
2M4 |
Management (taro) |
ac |
$750.00 |
100% |
$750.00 |
|
Wetland Wildlife Habitat Mgmt |
644 |
2M5 |
Management (CRP, WHIP, WRP) |
ac |
n/a |
75% |
75% actual |
|
|
|
|
|
|
|
|
|
|
Windbreak/Shelterbelt Establishment |
380 |
2E5 |
Earthwork, haul fee |
ea |
$500.00 |
75% |
$375.00 |
|
Windbreak/Shelterbelt Establishment |
380 |
2V2 |
Veg Cover, tree/shrub |
ea |
$3.20 |
75% |
$2.40 |
|
Windbreak/Shelterbelt Establishment |
380 |
2V3 |
Veg Cover, native plants |
ea |
$20.00 |
75% |
$15.00 |
|
Windbreak/Shelterbelt Establishment |
380 |
2V4 |
Veg Cover, cane |
ft |
$1.20 |
75% |
$0.90 |
|
Windbreak/Shelterbelt Establishment |
380 |
2L1 |
Irrigation Lateral |
ft |
$0.40 |
75% |
$0.30 |
(01/07/03)
|